{"id":9326,"date":"2026-09-09T16:44:41","date_gmt":"2026-09-09T11:14:41","guid":{"rendered":"https:\/\/trivediassociates.co.in\/blog\/?p=9326"},"modified":"2026-09-11T17:37:06","modified_gmt":"2026-09-11T12:07:06","slug":"electric-wire-rope-hoist-installation-compliance","status":"publish","type":"post","link":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/","title":{"rendered":"Electric Wire Rope Hoist Installation: Inspection, Load Testing &#038; Compliance Requirements"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">If you&#8217;re planning an electric wire rope hoist installation for your facility, the real question isn&#8217;t just &#8220;is it installed?&#8221; It&#8217;s whether the hoist is structurally sound, correctly load-tested, and backed by documentation that will hold up if a factory inspector \u2014 or worse, an incident \u2014 ever asks for it. A hoist can look perfectly mounted and still be a liability if the runway beam wasn&#8217;t verified for the load, the commissioning test was skipped, or nobody kept a record of what was checked and when.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide walks through what a proper electric wire rope hoist installation actually requires \u2014 before the hoist goes into <strong><a href=\"https:\/\/trivediassociates.co.in\/\" data-type=\"link\" data-id=\"https:\/\/trivediassociates.co.in\/\" target=\"_blank\" rel=\"noreferrer noopener\">service<\/a><\/strong> and after \u2014 so the equipment is safe to operate and your plant stays on the right side of statutory requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">What This Guide Covers in an Electric Wire Rope Hoist Installation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This article covers what a complete electric wire rope hoist installation needs to get right: structural verification, SWL (Safe Working Load) confirmation, wire rope condition, hooks, brakes, limit switches and other safety devices, load testing, commissioning documentation, and statutory inspection requirements. Installation mechanics \u2014 mounting, reeving, wiring \u2014 are covered too, but only as a condensed overview. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The heavier focus here is deliberately on what gets checked, tested, and documented during and after installation, since that&#8217;s usually where compliance gaps show up, not in the physical act of bolting a hoist to a beam.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Is an Electric Wire Rope Hoist (Quick Context)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An electric wire rope hoist is a lifting device that uses a motor-driven drum to wind and unwind a steel wire rope, raising and lowering loads along a hook. It&#8217;s typically mounted on a monorail, runway beam, or gantry<strong><a href=\"https:\/\/trivediassociates.co.in\/tower-crane.html\" data-type=\"link\" data-id=\"https:\/\/trivediassociates.co.in\/tower-crane.html\" target=\"_blank\" rel=\"noreferrer noopener\">\/EOT crane<\/a><\/strong> system and is common in Gujarat&#8217;s industrial units for material handling in workshops, warehouses, and production floors where loads are heavier or lifting is more frequent than what a chain hoist can comfortably handle. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Compared to chain hoists, wire rope hoists generally offer higher lifting capacities and faster lifting speeds, which is one of the main reasons an electric wire rope hoist installation is the default choice in many mid-to-large industrial setups.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">Structural Verification Before Commissioning<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/hoist-runway-beam-load-capacity-verification-1024x577.webp\" alt=\"Runway beam load capacity verification for electric wire rope hoist installation\" class=\"wp-image-9329\" title=\"Runway beam load capacity verification for electric wire rope hoist installation\" srcset=\"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/hoist-runway-beam-load-capacity-verification-1024x577.webp 1024w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/hoist-runway-beam-load-capacity-verification-300x169.webp 300w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/hoist-runway-beam-load-capacity-verification-768x432.webp 768w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/hoist-runway-beam-load-capacity-verification-1536x865.webp 1536w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/hoist-runway-beam-load-capacity-verification.webp 1918w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Beam capacity and deflection must be verified against the applicable structural standard before the hoist goes into service.<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Before an electric wire rope hoist is put into <strong><a href=\"https:\/\/trivediassociates.co.in\/unique-service-centre-for-lifting-tools-tackles.html\" data-type=\"link\" data-id=\"https:\/\/trivediassociates.co.in\/unique-service-centre-for-lifting-tools-tackles.html\" target=\"_blank\" rel=\"noreferrer noopener\">service<\/a><\/strong>, the structure it&#8217;s mounted on needs to be verified \u2014 not assumed \u2014 to handle the load. This is one of the most overlooked stages of an electric wire rope hoist installation, and it&#8217;s one of the most common sources of failure down the line.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Runway Beam Load Capacity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Rated for the load&#8221; doesn&#8217;t just mean the beam can hold the hoist&#8217;s rated capacity sitting still. It needs to account for the static load (the hoist plus the maximum load it will lift), the dynamic load factor (the extra stress created when a load is lifted, lowered, or moved, since motion adds force beyond simple weight), and the total system weight, including the trolley and hoist unit itself. A beam that was fine for a lighter hoist or a different duty cycle may not automatically be fine for a new one, so this needs to be checked against the specific hoist and its intended use, not just carried over from a previous installation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Deflection<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Deflection is how much a beam bends under load, and it matters because excessive deflection affects both structural safety and how smoothly the hoist travels along the runway. The right way to think about deflection is as a design consideration governed by the applicable structural design standard for your installation \u2014 it isn&#8217;t a single number that applies everywhere. The specific deflection limit depends on which standard your structural engineer is designing to, so it should always be tied back to that standard rather than treated as a universal figure.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Documentation to Request From the Structural Engineer<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before commissioning, it&#8217;s worth requesting the following from whoever certified the structure:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Beam capacity certification confirming the runway is rated for the hoist&#8217;s load<\/li>\n\n\n\n<li>Deflection calculation tied to the applicable structural design standard<\/li>\n\n\n\n<li>Mounting and bracket compatibility confirmation<\/li>\n\n\n\n<li>Connection point stress analysis<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Note for technical review: the applicable structural design standard(s) and their deflection limits need to be confirmed before this section can reference specific numbers.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">Hoist Components Inspected Before and During Use<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/wire-rope-hoist-condition-inspection-1024x577.webp\" alt=\"Wire rope condition inspection showing spooling on electric hoist drum\" class=\"wp-image-9330\" title=\"Wire rope condition inspection showing spooling on electric hoist drum\" srcset=\"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/wire-rope-hoist-condition-inspection-1024x577.webp 1024w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/wire-rope-hoist-condition-inspection-300x169.webp 300w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/wire-rope-hoist-condition-inspection-768x432.webp 768w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/wire-rope-hoist-condition-inspection-1536x865.webp 1536w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/wire-rope-hoist-condition-inspection.webp 1918w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Even, tight spooling and regular visual checks help catch broken wires, corrosion, and birdcaging early.<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Once the structure is verified, attention shifts to the hoist itself. These are the components that need checking before first use and then on an ongoing basis.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">SWL\/WLL Marking and Nameplate Verification<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Every electric wire rope hoist should carry a clear nameplate showing its Safe Working Load (SWL) or Working Load Limit (WLL). This should be checked against the actual load being lifted every time \u2014 not assumed from memory \u2014 and the marking itself should be legible and intact.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Wire Rope Condition<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The wire rope is the component under the most continuous stress, and it needs regular visual inspection for broken wires, corrosion, kinking, and birdcaging (where the rope strands separate and splay outward, usually from shock loading or improper spooling). If you&#8217;re assessing how many broken wires are acceptable before a rope needs replacing, that&#8217;s governed by the rope&#8217;s diameter-to-wire (D\/d) ratio, which is covered in more detail in our article on lifting slings.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Hooks, Brakes and Limit Switches<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Hooks should be checked for deformation or throat opening beyond acceptable limits, since a stretched hook is a sign it&#8217;s been overloaded at some point. Brakes need functional testing to confirm they hold the rated load without drift or slippage. Limit switches \u2014 both upper and lower travel limits \u2014 should be tested to confirm the hoist stops exactly where it&#8217;s supposed to, every time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Other Safety Devices<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Overload protection devices, which prevent the hoist from lifting beyond its rated capacity, and end-of-travel limits on both the hoist and trolley should be part of the routine check, not just the initial commissioning.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">Load Testing &amp; Commissioning<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-load-testing-commissioning-1024x577.webp\" alt=\"Technician conducting load testing and commissioning of electric wire rope hoist\" class=\"wp-image-9328\" title=\"Technician conducting load testing and commissioning of electric wire rope hoist\" srcset=\"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-load-testing-commissioning-1024x577.webp 1024w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-load-testing-commissioning-300x169.webp 300w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-load-testing-commissioning-768x432.webp 768w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-load-testing-commissioning-1536x865.webp 1536w, https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-load-testing-commissioning.webp 1918w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Commissioning testing verifies limit switches, brakes, and the applicable proof load before a hoist enters regular service.<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">A hoist shouldn&#8217;t go into regular service until it&#8217;s passed a proper commissioning test. What that test looks like \u2014 the specific proof load applied and how it&#8217;s sequenced \u2014 is linked to the applicable equipment standard, the relevant statutory provision, the relevant Indian Standard, and the manufacturer&#8217;s own requirements for that hoist model. It isn&#8217;t a fixed universal percentage sequence that applies to every hoist regardless of make or capacity, so this should always be confirmed against the documentation for your specific unit rather than assumed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What a Commissioning Test Should Verify<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At minimum, a commissioning test should confirm that limit switches and brakes function correctly under load, alongside verification against the applicable proof\/test load for that hoist and installation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Commissioning Documentation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once testing is complete, the record should capture:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The test load that was applied<\/li>\n\n\n\n<li>The standard referenced for that test<\/li>\n\n\n\n<li>The date of testing<\/li>\n\n\n\n<li>The identity of the technician or Competent Person who carried it out<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Note for technical review: the applicable Indian Standard\/statutory reference and manufacturer requirement for the proof\/test load need to be confirmed before this section can specify an exact sequence or percentage.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">Installation Steps \u2014 Condensed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The installation itself is worth understanding at a high level, even though structural verification and testing matter more for long-term safety:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Site and structural verification<\/strong> \u2014 confirming the runway beam and mounting points are rated for the specific hoist before anything is fixed in place<\/li>\n\n\n\n<li><strong>Mounting the hoist and trolley<\/strong> \u2014 alignment and fastening should follow the manufacturer&#8217;s torque tables for that specific model, rather than a generic assumed range<\/li>\n\n\n\n<li><strong>Wire rope reeving and spooling<\/strong> \u2014 the rope needs to spool evenly and tightly onto the drum; loose or uneven spooling is a common cause of premature rope damage<\/li>\n\n\n\n<li><strong>Electrical connection<\/strong> \u2014 power should be isolated before any wiring work begins, voltage and current need to match the hoist&#8217;s rated specifications, and an accessible emergency shutoff should be part of the setup from day one<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">Regional Compliance Requirements \u2014 India-First<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For hoists operating in Gujarat, the compliance basis that matters most is the applicable Indian Standard and Gujarat Factories Rules. International standards are useful as context but aren&#8217;t what a factory inspector in Gujarat will be checking against.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Basis<\/th><th>Standard \/ Reference<\/th><th>Key Requirement<\/th><\/tr><\/thead><tbody><tr><td>India (primary)<\/td><td>The Factories Act, 1948 in Gujarat is regulated and enforced alongside the Gujarat Factories Rules, 1963<\/td><td>Design, testing, and safety-device standards; inspection by a Competent Person<\/td><\/tr><tr><td>USA (context only)<\/td><td>OSHA \/ ASME B30.16<\/td><td>Certified installer, load testing, inspection records<\/td><\/tr><tr><td>EU (context only)<\/td><td>CE \/ EN 14492-1<\/td><td>Conformity marking, deflection and duty class compliance<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Note for technical review: the exact applicable Indian Standard(s) and any Gujarat-specific provision need to be confirmed before publication.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Actually Goes Wrong \u2014 Installation &amp; Compliance Mistakes to Avoid<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most hoist failures and compliance issues trace back to a handful of avoidable mistakes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Beam not rated for dynamic load<\/strong> \u2014 the structure was checked for static weight but not for the added stress of actual lifting motion<\/li>\n\n\n\n<li><strong>Power supply mismatch discovered mid-install<\/strong> \u2014 voltage or current specs weren&#8217;t confirmed before the hoist arrived on site<\/li>\n\n\n\n<li><strong>Improper spooling causing rope damage<\/strong> \u2014 uneven or loose spooling wears down the wire rope far faster than it should<\/li>\n\n\n\n<li><strong>Skipped or rushed load testing<\/strong> \u2014 commissioning gets treated as a formality instead of a genuine verification step<\/li>\n\n\n\n<li><strong>Misaligned trolley\/runway causing premature wear<\/strong> \u2014 small alignment errors compound into significant wear over time<\/li>\n\n\n\n<li><strong>No documented commissioning record<\/strong> \u2014 this isn&#8217;t just an operational gap, it&#8217;s a compliance risk, since there&#8217;s nothing to show an inspector that the hoist was ever properly tested<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">First 30 Days &amp; Ongoing Inspection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The first month of a hoist&#8217;s operation is worth watching closely. This is the break-in period, and it&#8217;s when minor installation or manufacturing issues tend to surface \u2014 unusual noise, uneven rope spooling, brake drift, or limit switches that don&#8217;t stop the hoist precisely where they should. A first-month inspection checklist that covers these points, checked more frequently than the standard schedule, helps catch problems before they become bigger ones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After that initial period, re-inspection should follow the same category-based cadence used across our other hoist and lifting equipment articles: pre-use checks before every shift, periodic thorough examination at defined intervals, and post-repair inspection any time the hoist has been serviced or modified. There isn&#8217;t one universal number that fits every hoist and every duty cycle \u2014 the right cadence depends on usage intensity and the applicable statutory requirement for that category of equipment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">FAQs<\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1788951388524\"><strong class=\"schema-faq-question\"><strong>Who is authorised to load-test and certify an electric wire rope hoist in Gujarat?<\/strong><\/strong> <p class=\"schema-faq-answer\"> Load testing and certification should be carried out by a Competent Person as recognised under the applicable Gujarat Factories Rules, working to the relevant Indian Standard and the manufacturer&#8217;s requirements for that specific hoist.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1788951397934\"><strong class=\"schema-faq-question\"><strong>What&#8217;s the difference between commissioning testing and periodic re-inspection?<\/strong><\/strong> <p class=\"schema-faq-answer\"> Commissioning testing happens once, before a hoist enters regular service, to verify it&#8217;s safe to operate as installed. Periodic re-inspection is the ongoing thorough examination carried out at defined intervals throughout the hoist&#8217;s working life to confirm it remains safe to continue using.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1788951407511\"><strong class=\"schema-faq-question\"><strong>What&#8217;s the difference between chain and wire rope hoists for factory use?<\/strong><\/strong> <p class=\"schema-faq-answer\"> Chain hoists typically suit lighter, less frequent lifting tasks and tighter spaces, while electric wire rope hoists are generally better suited to heavier loads and higher-duty applications where lifting speed and capacity matter more.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1788951418085\"><strong class=\"schema-faq-question\"><strong>What documentation should I receive after commissioning?<\/strong> <\/strong> <p class=\"schema-faq-answer\">You should receive a record showing the test load applied, the standard referenced for that test, the date it was carried out, and the identity of the technician or Competent Person who performed it.<\/p> <\/div> <\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">Conclusion \/ Next Step<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A completed electric wire rope hoist installation is only the first step. What actually protects your plant \u2014 and your people \u2014 is confirming the structure can handle the load, running a proper commissioning test against the right standard, and keeping documentation that proves it. If you&#8217;re planning a new electric wire rope hoist installation or need to verify one that&#8217;s already running, it&#8217;s worth scheduling an inspection and commissioning consultation before it goes into full-time use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you&#8217;re planning an electric wire rope hoist installation for your facility, the real question isn&#8217;t just &#8220;is it installed?&#8221; It&#8217;s whether the hoist is structurally sound, correctly load-tested, and backed by documentation that will hold up if a factory inspector \u2014 or worse, an incident \u2014 ever asks for it. A hoist can look&#8230;<\/p>\n","protected":false},"author":5,"featured_media":9327,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9326","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Electric Wire Rope Hoist Installation: Inspection &amp; Compliance Trivedi Associates<\/title>\n<meta name=\"description\" content=\"Learn what&#039;s required for electric wire rope hoist installation \u2014 structural checks, load testing, safety devices, and Gujarat compliance documentation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electric Wire Rope Hoist Installation: Inspection &amp; Compliance Trivedi Associates\" \/>\n<meta property=\"og:description\" content=\"Learn what&#039;s required for electric wire rope hoist installation \u2014 structural checks, load testing, safety devices, and Gujarat compliance documentation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/\" \/>\n<meta property=\"og:site_name\" content=\"Trivedi Associates\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/tcradvanced\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-09T11:14:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-11T12:07:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-installation-runway-beam.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1918\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"trivedi associate\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@TCRadv\" \/>\n<meta name=\"twitter:site\" content=\"@TCRadv\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"trivedi associate\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/\"},\"author\":{\"name\":\"trivedi associate\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/#\\\/schema\\\/person\\\/ff8f8a48aebc2128165f8266aec4e751\"},\"headline\":\"Electric Wire Rope Hoist Installation: Inspection, Load Testing &#038; Compliance Requirements\",\"datePublished\":\"2026-09-09T11:14:41+00:00\",\"dateModified\":\"2026-09-11T12:07:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/\"},\"wordCount\":2019,\"image\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/electric-wire-rope-hoist-installation-runway-beam.webp\",\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/\",\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/\",\"name\":\"Electric Wire Rope Hoist Installation: Inspection & Compliance Trivedi Associates\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/electric-wire-rope-hoist-installation-runway-beam.webp\",\"datePublished\":\"2026-09-09T11:14:41+00:00\",\"dateModified\":\"2026-09-11T12:07:06+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/#\\\/schema\\\/person\\\/ff8f8a48aebc2128165f8266aec4e751\"},\"description\":\"Learn what's required for electric wire rope hoist installation \u2014 structural checks, load testing, safety devices, and Gujarat compliance documentation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951388524\"},{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951397934\"},{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951407511\"},{\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951418085\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/electric-wire-rope-hoist-installation-runway-beam.webp\",\"contentUrl\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/electric-wire-rope-hoist-installation-runway-beam.webp\",\"width\":1918,\"height\":1080,\"caption\":\"A correctly mounted electric wire rope hoist on a runway beam \u2014 structural verification comes before commissioning.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electric Wire Rope Hoist Installation: Inspection, Load Testing &#038; Compliance Requirements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/\",\"name\":\"Trivedi Associates\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/#\\\/schema\\\/person\\\/ff8f8a48aebc2128165f8266aec4e751\",\"name\":\"trivedi associate\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e2a7f6771f81a64fc39b4020f324acf2788259748980e7fae51b670fae70762?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e2a7f6771f81a64fc39b4020f324acf2788259748980e7fae51b670fae70762?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e2a7f6771f81a64fc39b4020f324acf2788259748980e7fae51b670fae70762?s=96&d=mm&r=g\",\"caption\":\"trivedi associate\"},\"sameAs\":[\"http:\\\/\\\/trivediassociates.co.in\"],\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/author\\\/trivediassociate\\\/\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951388524\",\"position\":1,\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951388524\",\"name\":\"Who is authorised to load-test and certify an electric wire rope hoist in Gujarat?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\" Load testing and certification should be carried out by a Competent Person as recognised under the applicable Gujarat Factories Rules, working to the relevant Indian Standard and the manufacturer's requirements for that specific hoist.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951397934\",\"position\":2,\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951397934\",\"name\":\"What's the difference between commissioning testing and periodic re-inspection?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\" Commissioning testing happens once, before a hoist enters regular service, to verify it's safe to operate as installed. Periodic re-inspection is the ongoing thorough examination carried out at defined intervals throughout the hoist's working life to confirm it remains safe to continue using.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951407511\",\"position\":3,\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951407511\",\"name\":\"What's the difference between chain and wire rope hoists for factory use?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\" Chain hoists typically suit lighter, less frequent lifting tasks and tighter spaces, while electric wire rope hoists are generally better suited to heavier loads and higher-duty applications where lifting speed and capacity matter more.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951418085\",\"position\":4,\"url\":\"https:\\\/\\\/trivediassociates.co.in\\\/blog\\\/electric-wire-rope-hoist-installation-compliance\\\/#faq-question-1788951418085\",\"name\":\"What documentation should I receive after commissioning?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"You should receive a record showing the test load applied, the standard referenced for that test, the date it was carried out, and the identity of the technician or Competent Person who performed it.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Electric Wire Rope Hoist Installation: Inspection & Compliance Trivedi Associates","description":"Learn what's required for electric wire rope hoist installation \u2014 structural checks, load testing, safety devices, and Gujarat compliance documentation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/","og_locale":"en_US","og_type":"article","og_title":"Electric Wire Rope Hoist Installation: Inspection & Compliance Trivedi Associates","og_description":"Learn what's required for electric wire rope hoist installation \u2014 structural checks, load testing, safety devices, and Gujarat compliance documentation.","og_url":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/","og_site_name":"Trivedi Associates","article_publisher":"https:\/\/www.facebook.com\/tcradvanced","article_published_time":"2026-09-09T11:14:41+00:00","article_modified_time":"2026-09-11T12:07:06+00:00","og_image":[{"width":1918,"height":1080,"url":"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-installation-runway-beam.webp","type":"image\/webp"}],"author":"trivedi associate","twitter_card":"summary_large_image","twitter_creator":"@TCRadv","twitter_site":"@TCRadv","twitter_misc":{"Written by":"trivedi associate","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#article","isPartOf":{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/"},"author":{"name":"trivedi associate","@id":"https:\/\/trivediassociates.co.in\/blog\/#\/schema\/person\/ff8f8a48aebc2128165f8266aec4e751"},"headline":"Electric Wire Rope Hoist Installation: Inspection, Load Testing &#038; Compliance Requirements","datePublished":"2026-09-09T11:14:41+00:00","dateModified":"2026-09-11T12:07:06+00:00","mainEntityOfPage":{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/"},"wordCount":2019,"image":{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#primaryimage"},"thumbnailUrl":"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-installation-runway-beam.webp","inLanguage":"en-US"},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/","url":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/","name":"Electric Wire Rope Hoist Installation: Inspection & Compliance Trivedi Associates","isPartOf":{"@id":"https:\/\/trivediassociates.co.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#primaryimage"},"image":{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#primaryimage"},"thumbnailUrl":"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-installation-runway-beam.webp","datePublished":"2026-09-09T11:14:41+00:00","dateModified":"2026-09-11T12:07:06+00:00","author":{"@id":"https:\/\/trivediassociates.co.in\/blog\/#\/schema\/person\/ff8f8a48aebc2128165f8266aec4e751"},"description":"Learn what's required for electric wire rope hoist installation \u2014 structural checks, load testing, safety devices, and Gujarat compliance documentation.","breadcrumb":{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951388524"},{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951397934"},{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951407511"},{"@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951418085"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#primaryimage","url":"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-installation-runway-beam.webp","contentUrl":"https:\/\/trivediassociates.co.in\/blog\/wp-content\/uploads\/2026\/09\/electric-wire-rope-hoist-installation-runway-beam.webp","width":1918,"height":1080,"caption":"A correctly mounted electric wire rope hoist on a runway beam \u2014 structural verification comes before commissioning."},{"@type":"BreadcrumbList","@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trivediassociates.co.in\/blog\/"},{"@type":"ListItem","position":2,"name":"Electric Wire Rope Hoist Installation: Inspection, Load Testing &#038; Compliance Requirements"}]},{"@type":"WebSite","@id":"https:\/\/trivediassociates.co.in\/blog\/#website","url":"https:\/\/trivediassociates.co.in\/blog\/","name":"Trivedi Associates","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trivediassociates.co.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trivediassociates.co.in\/blog\/#\/schema\/person\/ff8f8a48aebc2128165f8266aec4e751","name":"trivedi associate","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4e2a7f6771f81a64fc39b4020f324acf2788259748980e7fae51b670fae70762?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4e2a7f6771f81a64fc39b4020f324acf2788259748980e7fae51b670fae70762?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4e2a7f6771f81a64fc39b4020f324acf2788259748980e7fae51b670fae70762?s=96&d=mm&r=g","caption":"trivedi associate"},"sameAs":["http:\/\/trivediassociates.co.in"],"url":"https:\/\/trivediassociates.co.in\/blog\/author\/trivediassociate\/"},{"@type":"Question","@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951388524","position":1,"url":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951388524","name":"Who is authorised to load-test and certify an electric wire rope hoist in Gujarat?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":" Load testing and certification should be carried out by a Competent Person as recognised under the applicable Gujarat Factories Rules, working to the relevant Indian Standard and the manufacturer's requirements for that specific hoist.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951397934","position":2,"url":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951397934","name":"What's the difference between commissioning testing and periodic re-inspection?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":" Commissioning testing happens once, before a hoist enters regular service, to verify it's safe to operate as installed. Periodic re-inspection is the ongoing thorough examination carried out at defined intervals throughout the hoist's working life to confirm it remains safe to continue using.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951407511","position":3,"url":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951407511","name":"What's the difference between chain and wire rope hoists for factory use?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":" Chain hoists typically suit lighter, less frequent lifting tasks and tighter spaces, while electric wire rope hoists are generally better suited to heavier loads and higher-duty applications where lifting speed and capacity matter more.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951418085","position":4,"url":"https:\/\/trivediassociates.co.in\/blog\/electric-wire-rope-hoist-installation-compliance\/#faq-question-1788951418085","name":"What documentation should I receive after commissioning?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"You should receive a record showing the test load applied, the standard referenced for that test, the date it was carried out, and the identity of the technician or Competent Person who performed it.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/posts\/9326","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/comments?post=9326"}],"version-history":[{"count":2,"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/posts\/9326\/revisions"}],"predecessor-version":[{"id":9333,"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/posts\/9326\/revisions\/9333"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/media\/9327"}],"wp:attachment":[{"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/media?parent=9326"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/categories?post=9326"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trivediassociates.co.in\/blog\/wp-json\/wp\/v2\/tags?post=9326"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}